Water Main Interconnect Project

East Lyme / New London Water Main Interconnect Project

Project Manager for ongoing work in support of the design of an interconnection water main in East Lyme/New London, Connecticut. The services have included the establishment of a linear survey control network, coordinating with an aerial photogrammetrist, and developing comprehensive base mapping. This work initiated with GPS establishment of preliminary elevation data at specified locations as directed by the design team. Subsequently, this progressed to field locations for a series of photo target points and field verifications of aerial mapping provided by the photogrammetrist. The key survey goals are to supplement the aerials with ground locations of wetland flags and utility features, to compile assessor’s parcel data, and to depict all of the above on CAD drawings that will encompass several miles of roadway and terrain.

Water Main Interconnect Project

Share this post:

Boundary and Topographic Survey

Boundary and Topographic Survey for Windham Magnet School, Windham, CT

Kevin Franklin was the Project Surveyor for a Class A-2 boundary and Class T-2 and T-3 topographic survey of approximately 40 acres of undeveloped land. The project included land record research and coordination with local utility services to obtain record data. The field work consisted of re-running an established survey traverse and performing a variety of procedures to verify existing boundary plans and aerial mapping. Additionally, the project involved proposing easements across neighboring properties to provide the school with water and sanitary lines.

Pre - Topographic Survey Rendering of Winham Magnet School

Share this post: