Site Survey in Glastonbury, Connecticut

From 2019 – 2020, we served as surveyor-of-record for a Site Redevelopment on Naubuc Avenue in Glastonbury. The project was conducted in the shadow of the Putnam Bridge, and was in support of the plan to convert an existing residence to commercial use as an attorney’s office.

Our work included survey of the FEMA flood hazard boundary lines and defining 1/2-foot interval contour lines within specially regulated areas. Over the winter, with construction initiated, we were back to lay out the lines and grades of the proposed site improvements. Walkways, ramps, and a new parking lot were installed as part of the change in use, with work completed in 2020.